Sewage_Impact_Assessment

Sewage_Impact_Assess - Sewerage Impact Assessment Estimate the quantity of wastewater from your development(Domestic Commercial Institutional

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Sewerage Impact Assessment . Estimate the quantity of wastewater from your development (Domestic / Commercial / Institutional / Industrial) . Calculate the Peak flow (Daily / Seasonal Variations) . Look for locations of public sewer . Obtain the Authority’s (DSD) consent to connect to the public sewer if this is feasible . The Authority (DSD/ EPD) will check and adviser you if the existing sewerage system or sewage treatment works will be capable to receive the wastewater from your development Sewerage Master Plan is being carried out by DSD to improve or upgrade the existing sewerage system within the sewage catchment area, but it takes time The capacities of the sewage treatment works are also closely monitored by DSD and upgrading programmes are being implemented when necessary. This may have an impact on the feasibility of your project . If the connection point in the public sewer is a distant form your development, you may have to get the Authorities’ agreement (DSD, LANDS….) to build a
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/24/2011 for the course CIVL 202 taught by Professor Chung during the Spring '10 term at HKUST.

Page1 / 2

Sewage_Impact_Assess - Sewerage Impact Assessment Estimate the quantity of wastewater from your development(Domestic Commercial Institutional

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online