HW4_F11 - Assume that coastal commission approval is not an...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Homework 4 Geog210a Due: October 28, 2011 Text Problems : 5.1.31, 5.1.35, 5.3.3, 5.3.7, 5.3.9, 5.3.17, 5.3.18, 5.3.21, 5.4.3, 5.4.13, 5.5.3, 5.5.12, 6.1.3, 6.1.4, 6.1.10, 6.1.14, 6.1.15, 6.2.2, 6.2.5, 6.2.7, 6.2.17, 6.2.18, 6.2.20, 6.3.3, 6.3.5, 6.3.21, 6.3.25, 6.3.30 DV Problems: 1. A researcher needs to run a electrical wire from a buoy 3 miles offshore and 17 miles down the coast to the UCSB marine laboratory. It costs 7.4 times as much to run a wire under water as it does on land. How should the wire be placed in order to minimize the cost of the installation?
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Assume that coastal commission approval is not an issue 2. Help the lazy professor write your final. Write an instructive, yet creative, question that you think that someone should be able to complete in less than 20 minutes. Discuss what points covered in class are used in your question and address how you will examine them. Give a complete answer for the question. Use material covered in this homework. Present the question and its answer on a single, separate sheet of paper, and remember to label this page with your name....
View Full Document

This note was uploaded on 12/28/2011 for the course GEOG 210a taught by Professor Davey during the Fall '09 term at UCSB.

Ask a homework question - tutors are online