a3_solution_3804_2011

A3_solution_3804_201 - from Sites 1 and 2 respectively Problem 2(Task 3 Moon Excavation Problem New constraint(for Iron 4 Virginia Tech(copyright

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Virginia Tech (copyright A.A. Trani) Assignment 3 Selected Solutions T.H. Kim and A. A. Trani Dept. of Civil and Environmental Engineering
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Virginia Tech (copyright A.A. Trani) Problem 1 (Pivot Table) 2
Background image of page 2
Virginia Tech (copyright A.A. Trani) Optimal solution x1 = 5333.4 metric tons per month from Site 1 (Tranquility Base) Problem 2 (Task 2) Moon Excavation Problem 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Virginia Tech (copyright A.A. Trani) Optimal solution x1 = 4821.2 and x2 = 958.9 metric tons per month
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: from Sites 1 and 2, respectively Problem 2 (Task 3) Moon Excavation Problem New constraint (for Iron) 4 Virginia Tech (copyright A.A. Trani) Problem 3, Task 2 Two constraints per pollution source: a) 10% b) Less than amount generated 5 Virginia Tech (copyright A.A. Trani) Problem 3, Task 3 Two constraints per pollution source: a) 10% b) Less than amount generated The investment is highly justifed (positive NPV) 6...
View Full Document

This note was uploaded on 01/01/2012 for the course CEE 3804 taught by Professor Aatrani during the Spring '07 term at Virginia Tech.

Page1 / 6

A3_solution_3804_201 - from Sites 1 and 2 respectively Problem 2(Task 3 Moon Excavation Problem New constraint(for Iron 4 Virginia Tech(copyright

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online