e4-1 - Name: Date: Instructor: Course: rd Managerial...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
FileName: c978d2b9a0b87e795981c98aa480fb8a12f71065.xls, Tab: Exercise E4-1, Page 1 of 2, 12/28/2011, 19:01:30 Name: Date: Instructor: Course: Standard Custom $50,000 $100,000 1,000 1,000 Setup hours 100 400 Total estimated overhead costs are $300,000 Overhead cost allocated to the machining activity cost pool is $200,000 and $100,000 is allocated to the machine setup activity cost pool. Instructions: Label Label Label Formula/Value Formula/Value Formula/Value Activity cost pools Cost drivers Estimated overhead Label Label Formula/Value Label Label Formula/Value Activity-based overhead rates Machining: Machine setup: Formula/Value Formula/Value Formula/Value Formula/Value Formula/Value Formula/Value Traditional costing Standard Custom Formula/Value Formula/Value Formula/Value Formula/Value Formula/Value Formula/Value Activity-based costing Standard Custom Machining: Formula/Value Formula/Value Formula/Value Formula/Value Machine setup: Formula/Value Formula/Value Formula/Value Formula/Value Formula/Value
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/28/2011 for the course ACCT 221 taught by Professor Leonarda.bacon during the Winter '07 term at CSU Bakersfield.

Page1 / 2

e4-1 - Name: Date: Instructor: Course: rd Managerial...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online