e4-4 - Name Date Instructor Course rd Managerial Accounting...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
FileName: aae6ded95225c4e7ff084d26b886bc61af98d44a.xls, Tab: Exercise E4-4, Page 1 of 2, 12/28/2011, 19:01:26 Name: Date: Instructor: Course: Car Truck 40,000 10,000 1 3 Total estimated overhead costs for the two product lines are $700,000 Instructions: Label Formula/Value Label Formula/Value Label Formula/Value Label Formula/Value Formula/Value Label Label Formula/Value Overhead assigned Label Formula/Value Label Formula/Value Label Activity Cost Pool Estimated Overhead Expected Use of Cost Drivers ABC Overhead Rate Setting up machines 1,000 setups $180,000.00 Formula/Value Assembling 70,000 labor hours $280,000.00 Formula/Value Inspection 1,200 inspections $240,000.00 Formula/Value Compute the activity-based overhead rates for these three cost pools. Setting up machines 1,000 setups $180,000.00 Formula/Value Assembling 70,000 labor hours $280,000.00 Formula/Value Inspection 1,200 inspections $240,000.00 Formula/Value Car Wheels Activity Cost Pool Cost Assigned Setting up machines 200 Formula/Value Formula/Value Assembling 40,000 Formula/Value Formula/Value Inspection 100 Formula/Value Formula/Value Total cost Formula/Value Truck Wheels Activity Cost Pool Cost Assigned Setting up machines
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 2

e4-4 - Name Date Instructor Course rd Managerial Accounting...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online