IBM-WebSphere-Business-Modeler-Advanced-V6-1-Business-Analysis-and-Design-(000-992).pdf - IBM 000-992 IBM WebSphere Business Modeler Advanced V6.1

IBM-WebSphere-Business-Modeler-Advanced-V6-1-Business-Analysis-and-Design-(000-992).pdf

This preview shows page 1 - 3 out of 5 pages.

000-992 IBM IBM WebSphere Business Modeler Advanced V6.1, Business Analysis and Design
Image of page 1
Which business measure metric should be used to capture the working duration of a task when the input business item contains a specific attribute value? A. Aggregate metric B. Average metric C. Instance metric D. Dimension metric Answer: C QUESTION: 95 What are two types of business measures that a user that a user can specify in WebSphere Business Modeler? (Choose two.) QUESTION: 96 ‘An insurance company has recently heard from its agents that customers are complaining about long claims processing times. The management team is puzzied because they feel their large call center operation is performing very efficiently. A business analyst has modeled the insurance claims process and run simulations tu assess the performance and pinpoint any bottlenecks or resource shortages. Which analysis should be used to identify
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '20
  • Business analyst

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture