MM305_Unit8_Project to be done

MM305_Unit8_Project - MM305 Quantitative Analysis for Managers Unit 8 Project Please download this document to your computer and save it using the

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MM305 Quantitative Analysis for Managers Unit 8 Project Please download this document to your computer and save it using the naming convention specified in the course syllabus. After completing and saving the project problems, submit your project in the Drop Box for Unit 8. 1. Precision Manufacturing has a government contract to produce stainless steel rods for use in military aircraft. Each rod is required to be 20 millimeters in diameter. Each hour, random samples of size n = 4 rods are measured to check process control. Five hours of observations yielded the following: Diameter Time Rod 1 Rod 2 Rod 3 Rod 4 9 A.M. 19.8 20.4 19.9 20.3 10 A.M. 20.1 20.2 19.9 19.8 11 A.M. 19.9 20.5 20.3 20.1 Noon 19.7 19.8 20.3 20.2 1 P.M. 19.7 20.1 19.9 19.9 Using these data and the table below, construct limits for xbar- and R-charts. Is the process in control? Control Chart Limits Factors Sample Size n Mean Factor A 2 Upper Range D 4 Lower Range D 3 2 1.880 3.628 0 3 1.023 2.574 0 4 0.729 2.282 0 5 0.577 2.114
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/05/2012 for the course 101 melissa jo taught by Professor Acc101 during the Spring '11 term at Aarhus Universitet.

Page1 / 5

MM305_Unit8_Project - MM305 Quantitative Analysis for Managers Unit 8 Project Please download this document to your computer and save it using the

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online