ce167f10_Midterm_2 - CE 167: Engineering and Project...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Professor William Ibbs Fall 2010 General Instructions This exam is to be completed in a bluebook – answers not recorded in a bluebook will not be graded. Place the exam sheets on the inside of your bluebook when finished and hand them in back with the bluebook. Put your name on both your blue book and the exam sheet. Show your work step-by-step. Write legibly, and state any necessary assumptions. If you have a question during any portion of this exam, raise your hand & speak privately to the proctor. Questions: 1. [15 points] Define following terms in relation to construction project management: A) Contra Preferentum B) Liquidated Damages C) Promissory Estoppel D) Bid Shopping 2. [20 points] Your organization has decided to install onsite power generation at one of your industrial sites in California. After consulting with vendors and a few project managers, you have narrowed down your options to three qualifying systems. Which of the three systems is the best allocation of resources for your organization given an MARR of 10%? High Temperature Fuel Cell Micro Turbine Reciprocating Engine Installation $(1,500,000) $(700,000) $(800,000) Savings year 1 $450,000 $250,000 $225,000 Savings year 2 $450,000
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/06/2012 for the course CIVIL AND 167 taught by Professor Ibbs during the Fall '11 term at University of California, Berkeley.

Page1 / 8

ce167f10_Midterm_2 - CE 167: Engineering and Project...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online