Lecture assignment 5

Lecture assignment 5 - – Calculate as follows • Completely cover all sides of the building • Only cover the areas that currently have brick

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
ENGR 13x2 Lecture Assignment 5 Due at the start of class on September 28, 2011 Read Horenstein (4.4 – 4.12) Note: this reading assignment is a change from the syllabus • October 5 th will be lab safety training (normal meeting location) You must be present for this lecture Estimate the number of bricks required to cover the exterior of Edmon Low Library (show your work)
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: – Calculate as follows • Completely cover all sides of the building • Only cover the areas that currently have brick • Assuming that a single brick will cost $0.40, what is the total cost of brick for each option? Do your estimates seem reasonable? Why or why not? • Problems 4.23 and 4.25 in Horenstein • Be sure to follow the homework submission guidelines in the syllabus...
View Full Document

This note was uploaded on 01/10/2012 for the course ENGR 1332 taught by Professor Nazemetz during the Fall '08 term at Oklahoma State.

Ask a homework question - tutors are online