quiz5fall01 - rL ENSC 3313 Fall 2001 Answer any 4 Questions...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
rL Name ENSC 3313, Fall 2001 QuizS Answer any 4 Questions only, 1 point each The starting material is a 10 rnrn diameter yellow brass (70 Cu -30 Zn) rod of hardness HRB (RB) ~. Required is an ~ diameter rod ofHRB 1Q. Describe an apRroRriate processing sequence. HRB = 70 signifies final processing stage of 20% cold work. Hence, we will need a' do ' given by 0.20 = ~ ~ ~ ~- [email protected] ~ = d2 o do = 8.94 mm O.8d~ =64, The material is heavily cold worked initially, hence we must soften (anneal) the rod. Thence, hQ! work from 10 mrn diameter to 8.94 mrn diameter, thence cold work 20% 2!: anneal thence cold work to 8.94 mrn diameter, anneal thence cold work 20%. If a particular cold worked brass rod takes 60' to recrystallize at 450°C and 20' to recrystallize at 480°C, then how long should recrystallization take at 500°C? 2 Recrystallization is a diffusion-controlled process. Rate = ! = Ce-B/T t where B, C are constants -B( 1h-1h ) = Ce-B/723 Dividing, Substituting, 3=e 1 60 1 20 = Ce-B/7S3 B = 19,936
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 2

quiz5fall01 - rL ENSC 3313 Fall 2001 Answer any 4 Questions...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online