CONSTRUCTION & BUILDING MANAGERS Brother Burr Chapter 9 CONSTRUCTION DELIVERY METHODS
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CONSTRUCTION DELIVERY METHODSS
Background image of page 2
Project Delivery Methods DEFINITIONS Design-Bid-Build (D-B-B): a project delivery method in which the Purchasing agency (Owner) sequentially awards separate contracts, the first for architectural and engineering services to design the project and the second for construction of the project according to design.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Delivery Methods DEFINITIONS Design/Build (D/B): a performance- based project delivery method in which the Purchasing agency (Owner) enters into a single contract for design and construction of a facility.
Background image of page 4
Project Delivery Methods DEFINITIONS Construction Manager-at-Risk (CM@R): a performance-based project delivery method in which the Purchasing agency (Owner) enters into separate contracts for design and construction services and negotiates a Guaranteed Maximum Price (GMP) with the Construction Manager. The CM@R serves as a consultant to the owner in the development and design phases by providing assistance in evaluating costs, estimating, value analysis, scheduling, and constructability. Once the GMP is established, the CM@R assumes the risk for price and schedule.
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Delivery Methods SELECTION PROCESS Design-Bid-Build: Architect/Engineer: Qualification Based Selection Request for Proposals (RFP) Contractor: Invitation for Bids (IFB) – Advantages:
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 16

Chapter_9_Delivery_Methods - Chapter 9 CONSTRUCTION...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online