Module12HWSol - simultaneously. 11. 12. The cost of the...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 7: Drill Problems 8, 9, 10, 11, 12, 19 and Application Problems 8 (a,c), 9. Drill Problems: 8. The two plants differ in capacity. The cost estimate follows the power law and sizing model: 9. The location difference is counted through the price index: 10. This question consider the location change, inflation and capacity improvement
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: simultaneously. 11. 12. The cost of the plant has been computed in problem 10, which is $992 million. The transmission line cost is re-computed as: 19. Note that here only the stock is not tax deductable. Application Problems: 8(a) Note that following a learning curve, the installation is supposed to be expedited: (b) 1 $412,500 $505,230...
View Full Document

This note was uploaded on 01/11/2012 for the course EIN 4354 taught by Professor Tufecki during the Fall '08 term at University of Florida.

Page1 / 2

Module12HWSol - simultaneously. 11. 12. The cost of the...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online