Project Number 1 Section 01700 Heritage May 2003 Execution Requirements SECTION 01700 EXECUTION REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Administrative and procedural requirements for installation, demolition, and cleaning. 2. Administrative and procedural requirements for project closeout, including a. Project record document submittal. b. Operations and maintenance manual submittal. c. Submittal of warranties. B. Related Sections 1. Closeout requirements for specific construction activities are included in appropriate Sections in Divisions 02 through 16. PART 2 PRODUCTS - Not Used PART 3 EXECUTION 3.1 PREPARATION A. Bracing, Shoring, And Sheathing - Design, furnish, and install all shoring, bracing, and sheathing as required for safety and for proper execution of the Work and have same removed if required when the Work is completed. 3.2 GENERAL INSTALLATION PROVISIONS A. Acceptable Suppliers / Installers 1. Where the heading ‘ VMR (Value Managed Relationship) Suppliers / Installers ’ is used to identify list of specified suppliers or installers, Owner has established relationships that extend beyond the requirements of this Project. No other suppliers / installers will be acceptable. Follow specified procedures to preserve relationships between Owner and specified suppliers / installers and advantages that accrue to Church from those relationships. 2. Where heading ‘ Acceptable Installers ’ is used to identify list of specified installers, use only one of listed installers. No others will be acceptable. B. Inspection of Conditions - Require installer of each major component to inspect both substrate and conditions under which Work is to be done. Notify Architect in writing of unsatisfactory conditions. Do not proceed until unsatisfactory conditions have been corrected. C. Manufacturer's Instructions - Comply with Manufacturer's installation instructions and recommendations, to extent that those instructions and recommendations are more explicit or stringent than requirements contained in Contract Documents. Notify Architect of conflicts between Manufacturer’s installation instructions and Contract Document requirements. D. Inspect materials or equipment before installation. Reject damaged and defective items. E. Provide attachment and connection devices and methods necessary for securing Work. Secure work true to line and level. Anchor each product securely in place, accurately located, and aligned with other Work. Allow for expansion and building movement. F. Visual Effects - Provide uniform joint widths in exposed Work. Arrange joints in exposed Work to obtain best visual effect. Refer questionable choices to Architect for final decision.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Number 2 Section 01700 Heritage May 2003 Execution Requirements G. Recheck measurements and dimensions before starting each installation. H.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 6

01700 - SECTION 01700 EXECUTION REQUIREMENTS PART 1 GENERAL...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online