02051

02051 - SECTION 02051 GENERAL SITE CONSTRUCTION REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A Includes But Not Limited to 1 General procedures and

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 02051 Heritage May 2003 General Site Construction Requirements SECTION 02051 GENERAL SITE CONSTRUCTION REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited to 1. General procedures and requirements for Site Work. PART 2 PRODUCTS - Not Used PART 3 EXECUTION 3.1 PREPARATION A. Site Verification Of Conditions 1. 48 hours minimum prior to performing any work on site, contact _Blue Stakes ________ to arrange for utility location services. 2. Perform minor, investigative excavations to verify location of various existing underground facilities at sufficient locations to assure that no conflict with the proposed work exists and sufficient clearance is available to avoid damage to existing facilities. 3. Perform investigative excavating 10 days minimum in advance of performing any excavation or underground work. 4. Upon discovery of conflicts or problems with existing facilities, notify Architect by phone or fax within 24 hours. Follow telephone or fax notification with letter and diagrams indicating
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 2

02051 - SECTION 02051 GENERAL SITE CONSTRUCTION REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A Includes But Not Limited to 1 General procedures and

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online