02230

02230 - SECTION 02230 SITE CLEARING PART 1 GENERAL 1.1...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 02230 Heritage May 2003 Site Clearing SECTION 02230 SITE CLEARING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Prepare site for rough grading and structure excavation as described in Contract Documents. B. Related Sections 1. Section 02051 - General Site Construction Requirements 2. Section 02312 - Finish grading of existing topsoil stored on site and addition of imported topsoil. 1.2 DEFINITIONS A. Existing topsoil is defined as total amount of soil stripped and stored for reuse, less vegetation layer stripped and disposed of as specified in Paragraph 3.1,C below. PART 2 PRODUCTS - Not Used PART 3 EXECUTION 3.1 PERFORMANCE A. Tree And Brush Removal 1. Cut off trees, shrubs, brush, and vegetative growth 12 inches maximum above ground. 2. Do not pull up or rip out roots of trees and shrubs that are to remain. If excavation through roots is required, excavate by hand and cut roots with sharp axe. Make clean, smooth, sloping cuts.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 2

02230 - SECTION 02230 SITE CLEARING PART 1 GENERAL 1.1...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online