Project Number 1 Section 02311 Heritage May 2003 Rough Grading SECTION 02311 ROUGH GRADING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Perform rough grading work required to prepare site for construction as described in Contract Documents. B. Related Sections 1. Section 02051 - General Site Construction Requirements 1.2 QUALITY ASSURANCE A. Pre-Installation Conference 1. Schedule conference after completion of site clearing but before beginning grading work. 2. Identify benchmark to be used in establishing grades and review Contract Document requirements for grades, fill materials, and topsoil. 3. Examine site to pre-plan procedures for making cuts, placing fills, and other necessary work. PART 2 PRODUCTS 2.1 MATERIALS A. Materials used for fill shall be as specified for backfill in Section 02315 . PART 3 EXECUTION 3.1 PREPARATION A. Before making cuts, remove topsoil over areas to be cut and filled that was not previously removed by stripping specified in Section
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 02230 . Stockpile this additional topsoil with previously stripped topsoil. 3.2 PERFORMANCE A. Site Tolerances 1. Maximum variation from required grades shall be 1 / 10 of one foot. 2. To allow for final finish grades of parking lot and planting areas, rough grade elevations before placing topsoil are -a. Sod Areas - 7 inches below top of walk or curb. b. Seeded Areas And Ground Cover Areas - 6 inches below top of walk or curb. c. Shrub Areas - 15 inches below top of walk or curb B. When existing grade around existing plants to remain is higher than new finish grade, perform regrading by hand. Do not expose or damage shrub or tree roots. C. Compact fills as specified in Section 02315 . D. If soft spots, water, or other unusual and unforeseen conditions affecting grading requirements are encountered, stop work and notify Architect. END OF SECTION...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern