02763

02763 - Project Number 1 Section 02763 Heritage May 2003 Pavement Marking SECTION 02763 PAVEMENT MARKING PART 1 GENERAL 1.1 SUMMARY A Includes But

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Project Number 1 Section 02763 Heritage May 2003 Pavement Marking SECTION 02763 PAVEMENT MARKING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish material and apply pavement and curb markings as described in Contract Documents. 1.2 QUALITY ASSURANCE A. Regulatory Requirements - Paint handicap spaces to conform to ADA Standards and local code requirements. 1.3 PROJECT CONDITIONS A. Project Environmental Requirements 1. Apply only on dry surfaces, during favorable weather, and when damage by rain, fog, or condensation not anticipated. 2. Latex Paint - a. Atmospheric temperature above 50 deg F. b. When temperature is not anticipated to drop below 50 deg F during drying period. 3. Alkyd or Chlorinated Rubber Paint - a. Atmospheric temperature above 40 deg F. b. When temperature is not anticipated to drop below 40 deg F during drying period. PART 2 PRODUCTS 2.1 MATERIAL A. Paint 1. Non-reflectorized....
View Full Document

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 2

02763 - Project Number 1 Section 02763 Heritage May 2003 Pavement Marking SECTION 02763 PAVEMENT MARKING PART 1 GENERAL 1.1 SUMMARY A Includes But

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online