07111

07111 - SECTION 07111 BITUMINOUS DAMPPROOFING PART 1...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 07111 Heritage May 2003 Bituminous Dampproofing SECTION 07111 BITUMINOUS DAMPPROOFING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and apply bituminous dampproofing to exterior foundation walls and top of footings as described in Contract Documents. 1.2 DELIVERY, STORAGE, AND HANDLING A. Maintain dampproofing at 40 deg F or above prior to application. 1.3 PROJECT CONDITIONS A. Project Environmental Requirements - Do not apply when ambient temperature is below 40 deg F, surface temperature is below 33 deg F, or when rain is expected before applied dampproofing will dry. 1.4 SCHEDULING A. Do not backfill against bituminous dampproofing for 24 hours after application. PART 2 PRODUCTS 2.1 MATERIALS A. Acceptable Products 1. Ecomul-11 by Epro Waterproofing Systems, Derby, KS (800) 882-1896 or (316) 262-2513 www.eproserv.com 2. Hydroban Foundation Coating by Euclid Chemical Co, Cleveland, OH (800) 321-7628 or (216) 531-9222 www.euclidchemical.com
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 2

07111 - SECTION 07111 BITUMINOUS DAMPPROOFING PART 1...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online