07312

07312 - SECTION 07312 FIBERGLASS REINFORCED SHINGLES PART 1...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 07312 Heritage May 2003 Fiberglass Reinforced Shingles SECTION 07312 FIBERGLASS REINFORCED SHINGLES PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install roofing system provided under Owner’s VMR procedures as described in Contract Documents. B. Products Installed But Not Supplied Under This Section 1. Roof flashing C. Related Sections 1. Section 07631 - Roof flashing and drip edge 2. Section 07636 or 07637 - Fascia 1.2 REFERENCES A. American Society For Testing And Materials 1. ASTM D 226-97a, 'Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing' 2. ASTM D 3018-00, 'Standard Specification for Class 'A' Asphalt Shingles Surfaced with Mineral Granules' 3. ASTM D 3462-00, 'Standard Specification for Asphalt Shingles Made from Glass Felt and Surfaced with Mineral Granules' 4. ASTM D 4586-00, 'Standard Specification for Asphalt Roof Cement, Asbestos-Free' 1.3 SYSTEM DESCRIPTION A. Design Requirements - This specification sets minimum standards for materials and workmanship. Manufacturer's warranty requirements or governing building codes shall apply where they impose higher standards. 1.4 SUBMITTALS A. Product Data 1. Manufacturer's literature or cut sheet for each component of system 2. Color and style selection 3. Manufacturer’s installation instructions and details for installation of secondary underlayment at penetrations, dormers, eaves, rakes, etc, to fit environmental conditions at Project. B. Samples - Full size shingle. 1.5 QUALITY ASSURANCE A. Pre-Installation Conference - Schedule pre-installation conference after installation of sheathing but before installation of any roofing system component. 1.6 PROJECT CONDITIONS A. Project Environmental Requirements - Do not install shingles at lower temperatures than allowed by Manufacturer for application.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Number 2 07312 Heritage May 2003 Fiberglass Reinforced Shingles 1.7 SEQUENCING A. Install valley secondary underlayment, valley primary underlayment, and valley metal after installation of general secondary underlayment, but before installation of general primary underlayment. 1.8 WARRANTY A. Special Warranty 1. Shingle Manufacturer's special 40 year minimum labor and material warranty written for VMR program, including but not limited to - a. First 5 years minimum of warranty will provide for full replacement cost, including tear- off and disposal, for any failure, including material defects and workmanship. Remaining 35 years of warranty will provide for pro-rated replacement cost. b.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 6

07312 - SECTION 07312 FIBERGLASS REINFORCED SHINGLES PART 1...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online