15051

15051 - SECTION 15051 GENERAL MECHANICAL REQUIREMENTS PART...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 15051 Project Name Project Date General Mechanical Requirements SECTION 15051 GENERAL MECHANICAL REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. General requirements and procedures for mechanical systems. 2. Responsibility for proper operation of electrically powered equipment furnished under this Division. 3. Interface with Testing And Balancing Agency. 4. Furnish and install sealants relating to installation of systems installed under this Division. 5. Furnish and install Firestop Penetration Systems for mechanical system penetrations as described in Contract Documents. B. Products Supplied But Not Installed Under This Section 1. Sleeves, inserts, supports, and equipment for mechanical systems installed under other Sections. C. Related Sections 1. Sections Under 02500 Heading - Piped utilities 2. Section 02776 - Exterior concrete pads and bases for mechanical equipment 3. Section 05090 - Quality and requirements for welding 4. Section 07840 - Quality of Penetration Firestop Systems to be used on Project and submittal requirements 5. Section 07920 - Quality of sealants used at building exterior 6. Section 09822 - Quality of acoustical sealants 7. Sections Under 09900 Heading - Painting of mechanical items requiring field painting 8. Section 13354 - Font water adjusting and balancing 9. Section 16420 - Magnetic starters and thermal protective devices (heaters) not factory mounted integral part of mechanical equipment 10. Division 16 - Raceway and conduit, unless specified otherwise, line voltage wiring, outlets, and disconnect switches 11. Slots and openings through floors, walls, ceilings, and roofs provided under other Divisions in their respective materials. 1.2 SUBMITTALS A. Product Data 1. Manufacturer's catalog data for each manufactured item. a. Provide section in submittal for each type of item of equipment. Include Manufacturer's catalog data of each manufactured item and enough information to show compliance with Contract Document requirements. Literature shall show capacities and size of equipment used and be marked indicating each specific item with applicable data underlined. b. Include name, address, and phone number of each supplier. B. Shop Drawings 1. Schematic control diagrams for each separate fan system, heating system, control panel, etc. Each diagram shall show locations of all control and operational components and devices. Mark correct operating settings for each control device on these diagrams. 2. Diagram for electrical control system showing wiring of related electrical control items such as firestats, fuses, interlocks, electrical switches, and relays. Include drawings showing electrical power requirements and connection locations. 3.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 6

15051 - SECTION 15051 GENERAL MECHANICAL REQUIREMENTS PART...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online