{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

15915M - SECTION 15915 ELECTRIC AND ELECTRONIC CONTROL PART...

Info icon This preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 15915 Project Name Project Date Electric And Electronic Control SECTION 15915 ELECTRIC AND ELECTRONIC CONTROL PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install automatic temperature control system as described in Contract Documents. 2. Furnish and install conductors and make connections to control devices and equipment. 3. Assist in air test and balance procedure. B. Related Sections 1. Section 13352 - Air test and balance 2. Section 15051 - General Mechanical Requirements 3. Section 15820 - Furnishing and installing of temperature control dampers 4. Section 15826 - Furnishing and installing damper actuator for Type 5 fire / smoke dampers 5. Division 16 - a. Furnishing and installing of raceway, conduit, and junction boxes, including pull wires, for temperature control system except as noted above. b. Power wiring to magnetic starters, disconnect switches, and motors. c. Motor starters and disconnect switches, unless integral with packaged equipment. 1.2 SYSTEM DESCRIPTION A. Performance Criteria - Install line and low voltage electrical wiring, raceway, conduit, and boxes in accordance with Division 16 of these Specifications. 1.3 SUBMITTALS A. Quality Assurance / Control - Provide written confirmation of certifications required under Article 1.4 - Quality Assurance. B. Closeout 1. Project Record Documents - Provide two copies of record ATC diagrams 1.4 QUALITY ASSURANCE A. Qualifications 1. ATC system providers / installers shall have following certifications and training before submitting quote - a. From Honeywell Inc - 1) Comfort Control Energy Specialist (CCES) 2) Automation Control Specialist (ACS) 3) Automation Control Integrator (ACI) b. From Approved Supplier - Be trained and certified in Owner specific communicating T7300 installation requirements by approved equipment supplier listed under paragraph 2.2,J and used by ATC system provider / installer. PART 2 PRODUCTS 2.1 GENERAL A. System controls shall be single manufacturer's products. 2.2 COMPONENTS
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Project Number 2 Section 15915 Project Name Project Date Electric And Electronic Control A. Room Thermostats 1. Programmable Thermostat Kit - a. Y7300M2028, Communicating Subbase 3H 3C b. Components Included in Kit - 1) Thermostat - a) Low voltage type provided with automatic change over feature for both heating and cooling stages, seven day program with two starts and stops per day, and provisions for damper operators. b) Approved Product - (1) Honeywell T7300F2010 2) Discharge Air Sensor - a) Approved Product - (1) Honeywell C7046C1000 3) Communicating Subbase - a) Approved Product - (1) Q7300H2029 B. Remote Room Sensor
Image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern