16210CMT

16210CMT - conductors current transformers metering...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Number 1 Section 16210 Project Name Project Date Electrical Utility Services SECTION 16210 ELECTRICAL UTILITY SERVICES PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install service as described in Contract Documents and as required by local serving agency. 2. Complete cost of service. B. Related Sections 1. Section 02776 - Transformer pad 2. Section 16051 - General Electrical Requirements 3. Local utility shall furnish and install primary underground service including transformer,
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: conductors, current transformers, metering conductors, and meter. PART 2 PRODUCTS- Not Used PART 3 EXECUTION 3.1 INSTALLATION A. Interface With Other Work - Coordinate with serving agency on all items, especially service entrance fittings, meter sockets, and current transformer (C/T) boxes where required. END OF SECTION...
View Full Document

This note was uploaded on 01/11/2012 for the course CM 105 taught by Professor Burr,k during the Winter '08 term at BYU.

Page1 / 2

16210CMT - conductors current transformers metering...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online