Juan Williams Assignment- Hardware Replacement Project

Juan Williams Assignment- Hardware Replacement Project -...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Assignment: Hardware Replacement Project By: Juan C. Williams University of Phoenix- IT 205 Jay Latona 07/11/2010 How do the five major variables of project management—scope, time, cost, quality, and risk relate to this scenario? Time – This would be the amount of time required to complete the project. Typically it is broken down into the time required to complete the components of the project. This is then broken down into the time required to complete each task contributing to the completion of the project
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Assignment: Hardware Replacement Project 2 | P a g e Cost - Cost will typically be determined by the consultant or contractors hourly rate multiplied by an estimated time to complete the project on time or if it is late. Quality - The amount of time put into individual tasks determines the overall quality of the project. Some tasks may require a given amount of time to complete, but if more time is given the project can be completed exceptionally. Over the course of a large project, quality can have a major impact on time and cost. Scope - The overall objective of what the project is supposed to accomplish, and a specific description of what the end result should be or accomplish. Risk - Potential points of failure. Most risks or potential failures can be overcome or resolved, given enough time and resources. Three of these variables can be given by external or internal customers. The value(s) of the remaining variable are then set by project management, ideally based on solid estimation techniques. The final values have to be agreed upon in a negotiation process between project management and the customer. Usually, the values in terms of time, cost, quality and scope are contracted. To keep control over the project from the beginning of the project all the way to its natural
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

Juan Williams Assignment- Hardware Replacement Project -...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online