hho8e_ewp_16-25a

hho8e_ewp_16-25a - Sherborn Construction, Inc....

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Req. 1 Date Debit Req. 2 P16-25A (30-45 min) Accounts Work in process inventory Finished goods inventory Credit Journal Entry
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Req. 3 Req. 4 Req. 5 Sherborn Construction, Inc. Reconciliation of finished goods inventory Subsidiary and Control Accounts Manufacturing overhead (40% of labor) Total cost equals Work in Process balance Unfinished houses: Direct materials Direct labor
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Sherborn Construction, Inc. Reconciliation of Work in process inventory Subsidiary and Control Accounts Total WIP Balance Completed, unsold house: Direct materials Direct labor Manufacturing overhead (40% of labor) Total cost equals Finished Goods balance Gross profit on Homes Sold In August Gross profit Sherborn Construction, Inc....
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Page1 / 2

hho8e_ewp_16-25a - Sherborn Construction, Inc....

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online