hho8e_ewp_16a-17b

hho8e_ewp_16a-17b - Direct materials Conversion costs Flow...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Req. 1 Complete Req. 2 P16A-17B(30–45 min) Start Complete Conversion Costs Flow of Production Equivalent Units Units accounted for: Direct Materials Equivalent units Flow of Physical Units Sue Electronics Assembly Department Equivalent Unit Computation Month Ended April 30
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Req. 3 Total × ( + ) × × Direct Materials Conversion Costs Sue Electronics Cost per equivalent unit Sue Electronics Assembly Department Cost per Equivalent Unit Month Ended April 30
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Direct materials Conversion costs Flow of Production Cost Assignment Month Ended April 30 Assign costs: Conversion Costs Assembly Department Total ending work in process inventory, April 30 Total cost accounted for Direct Materials a. Completed and transferred out b. Ending work in process, April 30: Req. 4 Bal., March 31 Work in process inventory – Assembly...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Page1 / 3

hho8e_ewp_16a-17b - Direct materials Conversion costs Flow...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online