hho8e_ewp_16a-21b

hho8e_ewp_16a-21b - Conversion Costs Conversion costs Flow...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Req.1 Complete Req.2 WaterBound Testing Department Equivalent Unit Computation (Weighted–Average) Equivalent units Tranferred In Conversion Costs Flow of Production Equivalent Units Flow of Physical Units P16A-21B (50-60 min) Start Complete Units accounted for:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Req.3 × ( + ) × × Req.4 a. Completed and transferred out Tranferred In Cost per Equivalent Unit (Weighted–Average) Testing Department WaterBound Transferred-in costs
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Conversion Costs Conversion costs Flow of Production Cost Assignment (WeightedAverage Method) Total costs to account for Total Tranferred In Total Costs Assignment of total costs: Conversion Costs b. Ending work in process inventory: Total ending work in process inventory Total cost accounted for Testing Department Cost per equivalent unit WaterBound...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Page1 / 2

hho8e_ewp_16a-21b - Conversion Costs Conversion costs Flow...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online