hho8e_ewp_22-1

hho8e_ewp_22-1 - actually sold differs from the static...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
1. The budget prepared for only one level of sales volume. 2. The difference between an actual amount and the budget. 3. A summarized budget for several levels of volume that separates variable costs from fixed costs. 4. The difference arising only because the number of units
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: actually sold differs from the static budget units. 5. The difference arising because the company actually earned more or less revenue, or incurred more or less cost, than expected for the actual level of output. S22-1 (10 min)...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Ask a homework question - tutors are online