hho8e_ewp_22-21

hho8e_ewp_22-21 - Flexible budget overhead for actual...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
E22-21 (20-30 min) Houston Paint Company Manufacturing Overhead Variances Total overhead variance: Actual overhead cost Standard overhead allocated to production Total overhead variance Overhead flexible budget variance: Actual overhead cost
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Flexible budget overhead for actual outputs Production volume variance Overhead flexible budget variance Flexible budget overhead for actual outputs Standard overhead allocated to production Production volume variance:...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Ask a homework question - tutors are online