hho8e_ewp_22-25a

hho8e_ewp_22-25a - Actual overhead cost Overhead flexible...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Req. 1 Req. 2 Direct materials Direct labor Direct materials Direct labor Manufacturing Overhead Variances Root Recliners Total overhead variance Total cost of goods sold Gross profit Efficiency variances Flexible Budget for Actual Outputs Price variances Variable overhead Fixed overhead Variable manufacturing costs: Fixed costs P22-25A (60-75 min) Sales revenue Direct materials Direct labor Root Recliners Standard overhead allocated to production
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Actual overhead cost Overhead flexible budget variance Flexible budget overhead for actual outputs Actual overhead cost Overhead flexible budget variance: Total overhead variance: Production volume variance Standard overhead allocated to production Flexible budget overhead for actual outputs Production volume variance: Req. 3 Req. 4 Standards:...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Page1 / 2

hho8e_ewp_22-25a - Actual overhead cost Overhead flexible...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online