hho8e_ewp_22-28a

hho8e_ewp_22-28a - Overhead flexible budget variance...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Req. 1 Req. 2 Date Accounts Debit Credit P22 28A (45 min) Direct materials Direct labor Direct materials Direct labor Price variances Efficiency variances Journal Entry
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Req. 3 Req. 4 Overhead flexible budget variance: Standard overhead allocated to production Production volume variance Actual overhead cost Flexible budget overhead for actual outputs
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Overhead flexible budget variance Production volume variance: Flexible budget overhead for actual outputs Standard overhead allocated to production Total overhead variance Stenback Computation of Overhead Variances Total overhead variance: Actual overhead cost...
View Full Document

This note was uploaded on 01/13/2012 for the course EAC 2221 taught by Professor Smith during the Spring '11 term at FIT.

Page1 / 2

hho8e_ewp_22-28a - Overhead flexible budget variance...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online