hho8e_ewp_22-29a

hho8e_ewp_22-29a - Production volume variance Req. 3...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
P22-29A (45-60 min) Req. 1 Price variances Direct materials Direct labor Efficiency variances Direct materials Direct labor Req. 2 SmartSound Computation of Overhead Variances Total overhead variance: Actual overhead cost Standard overhead allocated to production Total overhead variance Overhead flexible budget variance: Actual overhead cost Flexible budget overhead for actual outputs Overhead flexible budget variance Production volume variance: Flexible budget overhead for actual outputs Standard overhead allocated to production
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Production volume variance Req. 3 SmartSound Standard Cost Income Statement Month Ended September 30, 2011 Sales revenue Cost of goods sold at standard cost Manufacturing cost variances: Direct materials price variance Direct materials efficiency variance Direct labor price variance Direct labor efficiency variance Overhead flexible budget variance Production volume variances Total manufacturing variances Cost of goods sold at actual cost Gross Profit Req. 4...
View Full Document

Page1 / 4

hho8e_ewp_22-29a - Production volume variance Req. 3...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online