project-5

project-5 - CDA6530: Performance Models of Computers and...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
CDA6530: Performance Models of Computers and Networks (Fall 2011) Project 5: NS2 Simulation (Assigned Nov. 22; due: Dec. 5; late submission: Dec. 8 with 15 points off) To relieve some programming burden, project 5 is a group project that two students can form a group to do and submit one report. In your submitted report, please specify who is your partner. Of course, you can do this project alone if you want to or have hard time to find a partner. You are required to create the above topology and specified links (don’t consider the buffer capacity requirement). Both of the TCP and UDP sources should start transmitting at time 0.01 second, and stop at time 10.0 seconds. Configure the UDP source to be a CBR source, sending packets of size 1000 bytes, at a rate of 0.2Mbps. Configure the UDP sink to be a NULL sink. TCP source is a FTP source. Then add loss model to the link between two routers (see Page 41 in our ns2 lecture notes). Use the following to define the error model: set loss_module [new ErrorModel]
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.
Ask a homework question - tutors are online