power_budget

power_budget - Thermal 10.69% 0.14 0.002 2.01 7.00% 0.14256...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Total Power Power Budget Calculated Estimation Our System Budgeted Estimate Subsystem Percentage Allocated Standby Peak Peak On Time Average Power Variance Thermal 7.65% 0.14 0.14 0 7.65% 0.14 0.14 0 Comm. 10.93% 0.2 0.2 0 Magnetometer 16.39% 0.3 0.3 Other 0.00% 0 Science - Camera 30.05% 0.55 0.55 0 Science - Detector 16.39% 0.3 0.3 0 Total Allocated 89.07% 1.63 0 1.63 0 Contingency 10.93% 0.2 0.2 Total Power 100.00% 1.83 1.83 0 Model Budgeted Estimate Subsystem Percentage Allocated Standby Peak Peak On Time Average Power Variance
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Thermal 10.69% 0.14 0.002 2.01 7.00% 0.14256 C&DH 10.69% 0.14 0.05 0.3 30.00% 0.125 0.02 Comm. 16.03% 0.21 0.1 1 5.00% 0.145 0.06 Science - Camera 41.98% 0.55 1.5 17.00% 0.255 0.29 Science - Detector 5.34% 0.07 0.3 100.00% 0.3 0.04 Total Allocated 84.73% 1.11 0.152 0.96756 0.41 Contingency 15.27% 0.2 0.2 Total Power 100.00% 1.31 1.16756 0.41...
View Full Document

Ask a homework question - tutors are online