Rational-Unified-Process-(000-639).pdf - IBM 000-639 Rational Unified Process http\/killexams.com\/exam-detail\/000-639 Which of the following statements

Rational-Unified-Process-(000-639).pdf - IBM 000-639...

This preview shows page 1 - 3 out of 5 pages.

000-639IBMRational Unified Process
Background image
Which of the following statements are correct concerning the general iterative development philosophy within Rational Unified Process? (Select all that apply.) A. Early iterations should address the greatest risks. B. As a general rule, activities from all disciplines are applied in each iteration to build the system incrementally. C. Use of the waterfall lifecycle, rather than iterative lifecycle, usually delays risk reduction. D. With the possible exception of Inception iterations, each iteration should produce an executable release. E. When using an iterative lifecycle, testing only takes place after all of the coding iterations in the Construction phase have been completed. Answer: A, B, C, D QUESTION: 52 The project manager is typically responsible for which of the following artifacts? (Select all that apply.) A. Design Guidelines B. Iteration Assessment C. Status Assessments D. Business Case E. Software Development Plan Answer: B, C, D, E
Background image
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '20
  • project manager, Iterative and incremental development, unified process, IBM Rational Unified Process

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture