Quiz 2_F2011 - MGMT 30600 Quiz 2, Fall 2011 Name: Section:...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MGMT 30600 – Quiz 2, Fall 2011 Name: Section: ___________________________ Question 1. (6 points) Snow Witch Toboggan and Sled is trying to plan their production for the next two months. They would like to end November with at least 500 toboggans and 400 sleds in inventory. Their factory has 800 hours of production capacity each month. Their cost of holding inventory is 3% of production cost. Formulate a linear program to minimize their total production and inventory holding costs. Prod. cost ($) October demand November demand Current inventory Unit production time (minutes) Toboggan 15 1000 2500 300 20 Sled 12 1000 2000 200 10 Let T i be the number of toboggans manufactured in month i. Let S i be the number of sleds manufactured in month i. Let IT i be the number of toboggans in inventory at the end of month of i. Let IS i be the number of sleds in inventory at the end of month of i. i = 1 for October and 2 for November. ----------------------------------------------------------------------------------------------------------- - Let T i be the number of toboggans manufactured in month i. Let S i be the number of sleds manufactured in month i. Let IT i be the number of toboggans in inventory at the end of month of i. Let IS
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/17/2012 for the course MGMT 306 taught by Professor Staff during the Spring '08 term at Purdue University.

Page1 / 3

Quiz 2_F2011 - MGMT 30600 Quiz 2, Fall 2011 Name: Section:...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online