Ch 10-prob8 - AC 200 100 100 EV 80 40 40 PV 1750 217 217...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
CV = EV – AC SV = EV – PV CPI = EV /AC SPI = EV / PV Estimated Cost to Complete, ETC = (BAC – EV) / CPI. where BAC = Budget at Completion Estimated Cost at Completion, EAC = ETC + AC. Time Variance, TV = SV / (PV / Wks). The weekly values for AC, EV, and PV are evenly prorated over the scheduled interval for each activity.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Task Values Total $ Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 PV 300 150 150 AC 400 200 200 EV 300 150 150 PV 200 67 67 66 AC 180 60 60 60 EV 200 67 67 66 PV 250 125 125 AC 300 150 150 EV 250 125 125 PV 600 120 120 120 120 120 AC 400 100 100 100 100 EV 120 30 30 30 30 PV 400 100 100 100 100
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: AC 200 100 100 EV 80 40 40 PV 1750 217 217 311 245 220 220 220 100 AC 1480 260 260 310 250 200 200 0 0 EV 950 217 217 221 155 70 70 0 0 PV 217 434 745 990 1210 1430 1650 1750 AC 260 520 830 1080 1280 1480 1480 1480 EV 217 434 655 810 880 950 950 950 CV -43 -86 -175 -270 -400 -530 SV 0 0 -90 -180 -330 -480 CPI 0.83 0.83 0.79 0.75 0.69 0.64 SPI 1.00 1.00 0.88 0.82 0.73 0.66 TV 0.00 0.00 -0.36 -0.73 -1.36 -2.01 CSI 0.83 0.83 0.69 0.61 0.50 0.43 ETC 1837 1577 1388 1253 1265 1246 EAC 2097 2097 2218 2333 2545 2726 E Total Cumulative A B C D...
View Full Document

This note was uploaded on 01/18/2012 for the course IND/MECH mec 713 taught by Professor Bhole during the Fall '11 term at Ryerson.

Page1 / 3

Ch 10-prob8 - AC 200 100 100 EV 80 40 40 PV 1750 217 217...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online