HCIE-Cloud-Data-Center-Operations-Written-(H31-523).pdf - H31-523 Dumps H31-523 Braindumps H31-523 Real Questions H31-523 Practice Test H31-523 dumps

HCIE-Cloud-Data-Center-Operations-Written-(H31-523).pdf -...

This preview shows page 1 - 3 out of 5 pages.

H31-523 H31-523 Dumps H31-523 Braindumps H31-523 Real Questions H31-523 Practice Test H31-523 dumps free Huawei HCIE-Cloud Data Center Operations (Written)
Image of page 1
QUESTION 51 In the data center storage and backup scenario, which of the following is the ALL-IN-ONE positioning of BCManager services of Huawei RD products? A. Once-click test B. Data consistency C. Template-based policy configuration D. Automatic application identification Answer: A QUESTION 52 The two data centers use the remote replication technology and the synchronization period. Asynchronous remote replication is used for services with high continuity requirements and important data services. A. True B. False Answer: B QUESTION 53 The SIMPNANA software suite of CommVault uses a relational database as the Index and adopts a two-level distributed architecture? A. True B. False Answer: A QUESTION 54 In the data center disaster recovery and backup solution, data backup is used to solve the availability problem.
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '20
  • Computer data storage, Data center, Huawei, data center storage

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture