2ND MIDTERM SOLUTION FALL O4

2ND MIDTERM SOLUTION FALL O4 - EE4580 Test Fall 2004...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
EE4580 Test — Fall 2004 Suppose that the plant model is given by G ( s )= 10( s +1)( s + 10) s ( s 2 + s + 25) . 1. Sketch straightline approximation for magnitude Bode plot. 2. Find errors at corner frequencies, and make corrections with dashed line. 3. Repeat 1. for phase plot. 4. Estimate crossover frequency, and find the phase margin. 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Solution to Midterm II 1. The low and high frequencies are ω L =1 / 10 = 0 . 1 H =10 × 10 = 100 ,G L =20log 10 100 2 . 5 = 32dB . The initial slope is - 20dB / dec due to one pole at the origin. The straight line sketch for the magnitude Bode plot is shown in the solid line.
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/23/2012 for the course EE 4580 taught by Professor Gu during the Fall '10 term at LSU.

Page1 / 2

2ND MIDTERM SOLUTION FALL O4 - EE4580 Test Fall 2004...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online