Homework 7 Solutions - 1 CE 398 Introduction to Civil...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 CE 398 Introduction to Civil Engineering Systems Design, FALL 2011 Homework 7. Due Thursday, October 20, 2011 SOLUTIONS QUESTION 1 (Tools For Multi-Criteria Decision Making for the Task for Evaluation): As the Chief Metropolitan Engineer of the SunCity, you are evaluating bids from four contractors who submitted bids to you for a portfolio of projects. These projects are aimed at overhauling the city’s aging municipal infrastructure (local streets, sewer systems, water systems, bridges, street lights, etc.). You are evaluating their bids on the basis of four performance measures: contract bid amount, proposed construction period, contractor’s experience, contractor resource strength (equipment and skilled labor). From the submitted bids, the levels of each performance measure for each contractor, were determined and tabulated as shown below. PM Contractor Bid Amount ($millions) Proposed Construction Period (months) Contractor’s Experience (years) Contractor’s Resource Strength (1-10 scale) Apex, Inc. 7.1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/20/2012 for the course CIVIL ENGI 398 taught by Professor Labi during the Spring '11 term at Purdue University-West Lafayette.

Page1 / 2

Homework 7 Solutions - 1 CE 398 Introduction to Civil...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online