EE_4450_Project

EE_4450_Project - $18,900 new VD(section)=1.25v or change...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Sub-station 2 Feeder #3 Existing system forecast load LSN-exceeds 8 volt drop Voltage Drop-Total Source LSN 7965.0 7900.0 8.3 7965.0 7945.0 8.2 7945.0 7955.0 8.2 7945.0 8056.0 8.2 Recommended Cost system improvements change LSN 8000 to 3φ, 4/0(wire type) $47,600 new VD(section)=2.24v or change LSN 8000 to 2φ, 4/0(wire type) $35,000 new VD(section)=3.12v or change LSN 8000 to 3φ, 336(wire type) $61,200 new VD(section)=1.38v or change LSN 8000 to 2φ, 336(wire type) N/A new VD(section)=1.83v
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Sub-station 2 Feeder #3 change LSN 8000.2 to 3φ, 1/0(wire type) $18,000 new VD(section)=1.45v or change LSN 8000.2 to 3φ, 4/0(wire type) $25,200 new VD(section)=0.9v or change LSN 8000.2 to 2φ, 4/0(wire type)
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $18,900 new VD(section)=1.25v or change LSN 8000.2 to 3φ, 336(wire type) $32,400 new VD(section)=0.55v or change LSN 8000.2 to 2φ, 336(wire type) N/A new VD(section)=0.73v or change LSN 8000.2 to 1φ, 336(wire type) N/A new VD(section)=1.6v Sub-station 2 Feeder #3 Planned system forecast load Section Total Source LSN VD VD Amps %Cap Bus 8000 3.6 3.6 8000 8000.2 1.45 5.05 8000.2 8077 0.2 5.25 8000.2 7770 1.7 6.75 7770 7700 0.1 6.85 7770 7965 0.5 7.25 7965 7900 0.4 7.65 7965 7945 0.3 7.55 7945 7955 0.0 7.55 7945 8056 0.0 7.55------------...
View Full Document

Page1 / 3

EE_4450_Project - $18,900 new VD(section)=1.25v or change...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online