Sub-station 1 Feeder #3 Existing system There weren’t any line sections that had a voltage drop which exceeded 8V. Future system There were two line sections which had voltage drops that were either 8V or exceeded 8V, namely LSN 6900.3 and 7800.0 The following is the cheapest means to solve the above-mentioned problem: Change LSN 6540.0 (which was 3φ, 1/0) to 3φ, 336 where 1/0 and 336 are wire sizes. New VD (section) = 0.535V Since s = 1 mile, cost for the above change is $36,000 Planned system forecast load
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Source LSN LSN Section VD Total VD Bus 6500.0 2.4339 2.4339 6500.0 6500.1 0.8277 3.2616 6500.1 6500.2 0.0911 3.3527 6500.1 6540.0 0.535 3.7966 6540.0 6700.0 1.6831 5.4797 6700.0 6800.0 0.2855 5.7652 6800.0 6860.0 0.1558 5.921 6700.0 6900.0 1.2583 6.738 6900.0 6916.0 0.0106 6.7486 6900.0 6900.3 0.3927 7.1307 6900.3 7800.0 0.6484 7.7791 6540.0 6500.3 3.7966-------------------------------------------------------------------------------------------...
View Full Document

This note was uploaded on 01/24/2012 for the course EE 4450 taught by Professor Harbour during the Fall '09 term at LSU.

Ask a homework question - tutors are online