Submittal

Submittal - A leading company in energy for the 21st...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
“A leading company in energy for the 21 st century” Walter Castillo Romeo Clayton Carranza Guidry Chetan Karanth
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2369 Hispaniola Dr. Baton Rouge, LA 70804 tel: (225) 825-7002 fax: (225) 825-7004 Table of Contents Forward…………………………………………….……………………………. ....page 3 System Description…………………………………………. .…………………. .…page 5 Narrative of methods, Results and Recommendations For improvements. .......................................................... …………………………. ..page 7 Substation 1 Feeder 1……………………………………………….……. ..page 10 Substation 1 Feeder 3………………………………………………………page 18 Substation 2 Feeder 1………………………………………………………page 21 Substation 2 Feeder 3………………………………………………………page 24 Appendix………………………………………………………. ..…………………page 27 A. Total Cost Analysis……………………………………………………. .page 28 B. Calculations. ..................................................................................... …...page 29 C. Data Analysis. .................................................................................. …...page 30 D. Maps……………………………………………………………………page 42 2 “A leading company in energy for the 21 st century”
Background image of page 2
2369 Hispaniola Dr. Baton Rouge, LA 70804 tel: (225) 825-7002 fax: (225) 825-7004 FORWARD 3 “A leading company in energy for the 21 st century”
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2369 Hispaniola Dr. Baton Rouge, LA 70804 tel: (225) 825-7002 fax: (225) 825-7004 As four consulting engineers, we were asked to evaluate a distribution system for an operating District of SEC Utilities, Kayla Industrial Services (KIS). The operable District is in the state of Mississippi where an existing system needs upgrading because the Bureau of Census has predicted at least a 4% population growth in the said town of Unionville over the next five years. Therefore, our evaluation consists of an analysis of the existing system with existing loads, the existing system with forecasted loads, and the planned system which accounts for the population increase. When we conversed with the systems team at KIS, we were told that our system analysis had set requirements which had to be considered before we began as per our contract. One such requirement was that KIS required that there was no less than an 8 volt drop on a 120 volt base for all feeders. Second, it was required that action be initiated to relieve load or improve the system whenever 80% thermal capacity is exceeded on distribution lines under normal conditions. Last, KIS standards department required that wire type and size of any distribution system improvements be one of the following: #2 ASCR, 1/0 ACSR, 4/0 ACSR, or 336 KCM ACSR. Before we began, all system data was provided per our request, which was
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/24/2012 for the course EE 4450 taught by Professor Harbour during the Fall '09 term at LSU.

Page1 / 30

Submittal - A leading company in energy for the 21st...

This preview shows document pages 1 - 5. Sign up to view the full document.