PM598 Course Project 1B

PM598 Course Project 1B - REQUEST FOR PROPOSAL BASEBALL...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
REQUEST FOR PROPOSAL BASEBALL PRACTICE FIELD DESIGN AND CONSTRUCTION HURRICANES’ BASEBALL TEAM logistic@hurricanes.com (832) 403-5698 PM598 – Contract and Procurement Management TABLE OF CONTENTS | 1. INSTRUCTION TO BIDDERS| 4 | | 1.1 General Description of Work | 4 | | 1.2 What Must Included in the Bid | 4 | | 1.3 Schedule of Bid period Activities | 5 | | 1.4 Location of the Work | 6 | | 1.5 Pre-Bid Meeting | 7 | | 1.6 Owner Contact for Question | 7 | | 1.7 Pre-Award Surveys | 7 | | 1.8 Sealed Bid Requirements | 8 | | 1.9 Basis of Evaluation | 8 | | 1.10 Ethical Standards | 9 | | 1.11 Responsibility for Surety Bonds | 9 | | 1.12 Proposal Format | 10 | | 1.13 List of Bidders | 11 | | 1.14 Letter of Acknowledgement | 11 | | 2. DESCRIPTION OF WORK | 12 | | 2.1 Engineering Contract | 13 | | 2.2 Construction Contract | 13 | | 3. PROPOSAL | 14 | | 3.1 Breakdown of Bid Price | 14 | | 3.2 Revision and Extra Work | 15 | | 3.3 Escalation Formulas | 15 | | 3.4 Schedule Completion Dates | 15 | | 3.5 List of Subcontractors | 16 | | 3.6 Key Supplier or Contractor Personnel | 17 | | 3.7 Length of Time Bid is Valid | 17 | | 3.8 List of Bid Document Addenda Reviewed by Bidder | 17 | | 3.9 Notice of Conflicts or Errors in Bid Documents| 18 | | 3.10 Clarification of Bids | 18 | | 3.11 Bidder Signature | 18 | | 4. SPECIFICATIONS AND DRAWINGS | 19 | | 5. SPECIAL CONDITIONS | 20 | | 6. GENERAL CONDITIONS AND CONTRACT AGREETMENTS | 21 | | APPENDIX A | 23 | | APPENDIX B | 24 | | APPENDIX C | 25 |
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
| APPENDIX D | 26 | 1. INSTRUCTIONS TO BIDDERS 1.1 General Description of Work The scope of this proposal includes a complete design and construction of a Baseball Practice Field for a semi-pro baseball team called “Hurricanes.” The intended baseball field must have a club house and a parking lot for about 50 cars next to it. No spectators sitting are required. The BIDDER will be responsible for an integrated design and overall package to reach the requirements presented in this proposal. This facility must be constructed over an owned 20 acres land, which is relatively flat and requires small works in order to get it into conditions. To accomplish this, the BIDDER must consider demolishing some dilapidated structures, deforesting few small to medium size trees, and working on soil recondition. Also, the BIDDER must perform all the Engineering activities related with the design, control, and construction of the practices field, irrigation system, illumination system, club house, and parking lot. 1.2 What Must Be Included with Bid To properly evaluate the bid proposal, all of the information requested in this RFP must be provided by the BIDDER. In order to a better understanding of the requirements, Hurricanes’ Team divided those requirements in tree (3) major components, as shown below: * Technical Documents, which include Engineering Drawings List for the construction of the practice field, club house, and parking lot. Also, the BIDDER must include Structure Calculations and Foundation Design Procedures, Soil Studies Strategy, and an estimated Bill of
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/24/2012 for the course ECOM 101 taught by Professor Ata during the Spring '11 term at Acadia.

Page1 / 14

PM598 Course Project 1B - REQUEST FOR PROPOSAL BASEBALL...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online