sp9_report2

sp9_report2 - SP9 Weekly Report 2 Team # Page 1 of 7 Date...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
SP9 Weekly Report 2 Page 1 of 7 Team # Date Massachusetts Institute of Technology Unified Engineering Spring 2004 16.030/16.040 System Problem 9 Report 2 Date: Group # Name 1 Name 2 Name 3 Name 4 Name 5 *You may use your own cover page. However, all the information on this cover page must be included on your cover page.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
SP9 Weekly Report 2 Page 2 of 7 Team # Date I. Build I.3 Build and Manufacturing Schedule I.3.1 System I.3.2 Wing I.3.3 Tail I.3.4 Payload Accommodation I.3.5 Propulsion I.3.6 Landing Gear I.3.7 (Subsystem) I.4 Build and Manufacturing Time Estimates and Actuals I.4.1 System I.4.2 Wing I.4.3 Tail I.4.4 Payload Accommodation I.4.5 Propulsion I.4.6 Landing Gear I.4.7 (Subsystem) Build and Manufacturing Time Estimates and Actuals Estimate [hrs] Actual [hrs] YTD Wing Tail Payload Accommodation Propulsion Landing Gear (Subsystem) Integration System Total I.5 Build Status, Problems, and Problem Resolution I.5.1 System I.5.2 Wing I.5.3 Tail I.5.4 Payload Accommodation I.5.5 Propulsion I.5.6 Landing Gear I.5.7 (Subsystem)
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/28/2012 for the course AERO 16.01 taught by Professor Markdrela during the Fall '05 term at MIT.

Page1 / 7

sp9_report2 - SP9 Weekly Report 2 Team # Page 1 of 7 Date...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online