Principle L 15

Principle L 15 - Lesson 15 Cumulative Quiz 1. If a builder...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1. If a builder needed information about the location and size of the piers and footings of a house, he would consult the: B. foundation plan 2. An investor wanting to apply the principle of leverage would: B. use borrowed funds to the largest extent possible 3. All of the following are types of soil, except: A. adobe B. alkaline C. deciduous D. expansive C 4. A "turnkey project" is one that is: D. completed and ready for occupancy 5. A financial planner, when analyzing an investor's portfolio, would need to be concerned with: A. liquidity B. diversification C. yield D. All of the above D 6. The highest structural member in the wood frame of a conventional house is the: A. ridge board 7. A termite report should be obtained: C. before the property is put on the market 8. The advantages of renting a home, as opposed to buying, include all of the following except: A. greater mobility B. fewer responsibilities C. greater security D. less financial commitment C 9. In wood frame construction, the parallel framing members used to support floor and ceiling
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/29/2012 for the course REAL 1 taught by Professor Haynes during the Fall '11 term at West Valley.

Page1 / 3

Principle L 15 - Lesson 15 Cumulative Quiz 1. If a builder...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online