Copy of - 16 5 11 1.00E 030 Sheet1 Page 2 Homework#3-14,15,16 Mills 1 2 Cost per mill 6000 7000 Aluminum Requirements Required Usage Surplus

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Adjustable Cells Final Reduced Objective Allowable Allowable Cell Name Value Cost Coefficient Increase Decrease $B$11 Mill 1= 4 0 6000 1000 6000 $B$12 Mill 2= 0 1000 7000 1.00E+030 1000 Constraints Final Shadow Constraint Allowable Allowable Cell Name Value Price R.H. Side Increase Decrease $F$6 High (tons) Usage 24 0 12 12 1.00E+030 $F$7 Medium (tons) Usage 8 3000 8 1.00E+030 4 $F$8 Low (tons) Usage
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 16 5 11 1.00E+030 Sheet1 Page 2 Homework #3-14,15,16 Mills: 1 2 Cost per mill: 6000 7000 Aluminum Requirements: Required Usage Surplus High (tons) 6 2 12 24 12 Medium (tons) 2 2 8 8 Low (tons) 4 10 5 16 11 Production: Mill 1= 4 days Mill 2= days Cost= 24,000.00...
View Full Document

This note was uploaded on 01/31/2012 for the course BAD 305 taught by Professor Null during the Spring '12 term at GWU.

Page1 / 2

Copy of - 16 5 11 1.00E 030 Sheet1 Page 2 Homework#3-14,15,16 Mills 1 2 Cost per mill 6000 7000 Aluminum Requirements Required Usage Surplus

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online