Curries study guide

Curries study guide - MGT 302 Final Exam Study Guide The...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
MGT 302 Final Exam Study Guide The Goal The Goal and Measurements o The goal of a firm= to make money by reducing operational expenses and reduce inventory while simultaneously increasing throughput. o 3 Financial Measures of the Goal Net Profit (P) Return on Investment (ROI) Cash Flows (CF) o 3 Process-Level Measures of The Goal (enable you to develop operational rules or guidelines for running your plant) Throughput (T) the rate at which the system generates money through sales (not production; you must sell the item for it to count towards throughput) Ex) Inventory (I) all the money the system has invested in purchasing things that it intends to sell Ex)inventory, parts, scraps, knowledge, (not restricted to products or parts) Operational Expense (OE) all the money the system spends in order to turn inventory into throughput Ex)Labor, tooling, machines, scrap, knowledge o T, I, and OE to link local performance to global performance – each one of the measurements for inside the plant use the word “money.” T is the money coming in, I is the money currently in the system, and OE is the money that you pay out to make T happen. always talking about the organization as a whole (global performance) not just the manufacturing department. o *** GOAL: increase throughput while simultaneously reducing both inventory and operating expense Statistical Fluctuations and Dependant Events
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
o Balanced Capacity System a system where the capacity of each and every resource is balanced exactly with demand from the market. Unbalanced Capacity System a system where the capacity of each resource might be operating below or above the demand level from the market. ***takes into consideration the statistical fluctuations and dependent events o Fallacy of the balanced plant – the closer that you get to a balanced plant, the closer that you come to bankruptcy o A Balanced Capacity System is NOT a good idea, due to: Statistical Fluctuations Dependent Events o A system with statistical fluctuations but NOT dependent events Balanced system is a GOOD idea o A system with dependent events but NOT statistical fluctuation Balanced system is a GOOD idea o Rule – balance FLOW not CAPACITY o Be able to explain the impact of statistical fluctuations and dependent events on the performance and throughput rate of the system? The throughput rate decreases (lower than the expected average rate) ; because events might operate lower than the average rate at times and therefore the successor events are unable to operate at average rate because they are dependent on the rate of their preceding event o Hiking Example ***dependent events limit the high side of variability*** The troop spread out because they traveled in an accumulation of statistical fluctuations in walking speed rather than a constant average speed One person was walking slower than 2 mph while a person in front of them might have been walking faster than 2 mph; the gap between them increases
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 28

Curries study guide - MGT 302 Final Exam Study Guide The...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online