GREENDALE STADIUM CASE ID Activity Name Immediate Predecessor Duration 1Baseball Stadium 0 2Clear stadium Site 70 3Demolish Building 2 30 4Set up construction site 3 70 5Drive support piling 2 120 6Pour lower concrete bowl 5 120 7Pour main concourse 3,6 120 8Install playing field 3,6 90 9Construct upper steel bowl 3,6 120 10Install seats 7,9 140 11Build luxury boxes 7,9 90 12Install jumbotron 7,9 30 13Stadium infrastructure 7,9 120 14Construct steel canopy 10 75 15Light installation 14 30 16Build roof support 6 90 17Construct roof 16 180 18Install roof tracks 16 90 19Install roof 17,18 90 20Inspection 8,11,13,15,19 20 Network Schedule:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1. Between 1 July 2011 and 20 May 2014, there are 753 work days. Since the expected project completion time is less than 753 days, the project will be finished well before the deadline. 2. There are two critical paths for the project 2-5-6-7-10-14-15-20 and 2-5-6-9-10-14-15-20
Background image of page 2
The length of the critical path is 695 days.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 3. G&E should pursue this project. They have all the reasons that the project can be finished before 753 days as the length of critical path is 695 days and they have a slack of 58 days before the penalty start kicking in. The project will not only fetch a profit of $2 million, it will build brand value for G&E. Gantt Chart: 1 34 67 100 133 166 199 232 265 298 331 364 397 430 463 496 529 562 595 628 661 695 Baseball Stadium Clear stadium Site Demolish Building Set up construction site Drive support piling Pour lower concrete bowl Pour main concourse Install playing field Construct upper steel bowl Install seats Build luxury boxes Install jumbotron Stadium infrastructure Construct steel canopy Light installation Build roof support Construct roof Install roof tracks Install roof Inspection...
View Full Document

This note was uploaded on 01/29/2012 for the course BUSINESS LU124475 taught by Professor Prof.johns during the Spring '09 term at Liberty.

Page1 / 5

Group Discussion Board 3 - GREENDALE STADIUM CASE - 3....