week5 hwk f1515 - My Project Homework Assignment Week 5...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
My Project Homework Assignment Week 5 10-8 NPV IRRs and MIRRs for Independent Projects Edelmann is considering including two pieces of equipment, a truck and an overhead pulley system, in this year’s capital budget. The projects are independent. The cash outlay for the truck is $17, 000 and that for the pulley system is 22, 430. The firm’s cost of capital is 14%. Calculate the IRR, the NPV, and the MIRR for ech project, and indicate the correct accept-reject decision for each. Truck: NPV=-17,100 + $5, 100 (PVIFA14%, 5) = -$17,000 + $5,100(3,4331)=-17, 100 + $17, 509 =409-Accept IRR=15% MIRR=N=5, PV= 17,100, PMT=0, FV-33712 I=14.54% Accept Pulley NPV=-$22,430 + $7, 500(343310=-22, 430 + $25, 748=$3318 IRR=20% MIRR: PV Costs=$22, 430 N=5, I=14, PV=0, PMT=7500, FV=$49, 576 I=17.9% Accept 10-9-NPvs and IRRs for Mutually Exclusive Projects Davis Industries must choose between a gas-powered and an electric powered forklift truck for moving materials in its factory. Since both forklifts perform the same function, the firm will
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 3

week5 hwk f1515 - My Project Homework Assignment Week 5...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online