EGR_102_Lab_02B_Solution

EGR_102_Lab_02B_Solution - EGR 102 Lab 02B Homework Inputs:...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
EGR 102 Name: Solution Lab 02B Homework Section 1 Inputs: Blade Diameter (D) 30 m 1.29 Electricity Rate 0.12 $/kW-h Wind Speed (m/s) Efficiency Power (kW) 1-Year Profit 1-Year Profit 0 14.0% 0.000 $0.00 € 0.00 1 14.0% 0.064 $67.10 € 50.26 2 14.0% 0.511 $536.78 € 402.05 3 14.0% 1.723 $1,811.63 € 1,356.91 4 14.0% 4.085 $4,294.23 € 3,216.38 5 14.0% 7.979 $8,387.17 € 6,281.99 6 32.0% 31.513 $33,126.93 € 24,812.07 7 32.0% 50.042 $52,604.34 € 39,400.65 8 32.0% 74.699 $78,523.09 € 58,813.80 9 22.0% 73.121 $76,864.83 € 57,571.76 10 22.0% 100.303 $105,438.72 € 78,973.60 11 22.0% 133.504 $140,338.94 € 105,113.87 12 22.0% 173.324 $182,198.11 € 136,466.39 13 16.0% 160.266 $168,471.91 € 126,185.46 14 16.0% 200.169 $210,417.35 € 157,602.60 15 16.0% 246.199 $258,804.14 € 193,844.30 Question 1: Question 2: Air Density (ρ) kg/m 3 v = 10.441 m/s for D = 30 m and profit of $ 120,000 D = 34.989 m for v = 8 m/s and profit of € 80,000
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
--> -->
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/03/2012 for the course EGR 102 taught by Professor Hinds during the Spring '09 term at Michigan State University.

Page1 / 2

EGR_102_Lab_02B_Solution - EGR 102 Lab 02B Homework Inputs:...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online